PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine

Product Details
Customization: Available
After-sales Service: Oneline Video Support
Warranty: 1 Year Warranty Period
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Experienced Team
The supplier has 5 foreign trading staff(s) and 2 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
In-stock Capacity
The supplier has In-stock capacity
to see all verified strength labels (23)
  • PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
  • PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
  • PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
  • PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
  • PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
  • PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
AFE75
Type
Pipe Extruder
Plastic Processed
PE
Product Type
Corrugated Pipe Making Machine
Feeding Mode
One Feed
Assembly Structure
Integral Type Extruder
Screw
Single-Screw
Engagement System
Full Intermeshing
Screw Channel Structure
Deep Screw
Exhaust
Don′t Exhaust
Automation
Non-Automatic
Computerized
Non-Computerized
Name
Corrugated Pipe Making Machine
Final Products
Single Wall/Double Wall Corrugated Pipe
Suitable Material
PVC PP PE HDPE
Capacity
20~100kg/H
Voltage
380V 50Hz 3phase
Screw Diameter
45mm/55mm/65mm/75mm
Motor Power
11kw~37kw
L/D
28~30:1
Motor Brand
Siemens Beide Motor
Inverter Brand
ABB
Machine Color
Custoimzed
Tolerance
+-0.5~1mm
Screw Type
Single Screw
Temperature Controller
Omron
Max Heating Temperature
300~500 Degrees(It Depends on Material)
Transport Package
Plastic Film
Specification
20m*2m*2.6m
Trademark
Aifuer
Origin
Zhangjiagang
HS Code
8477209000
Production Capacity
30sets/Month

Product Description

Product Description

PP/HDPE/Pa 6 Nylon corrugated pipe making machine
Single Wall pLastic Corrugated pipe extruder machine

The machine is used to produce single wall corrugated pipe by PE PVC PP or PA Nylon Materials. This kind of corrugated pipe is always 10-50mm diameters, popular used in machine tool, machine building, eledtric insulation protection system, electric automatic control system, public traffic equipment, metor, electric locomotive and air-conditioner equipment, etc.
 
The high speed corrugated pipe machinery features:
 
1. High speed high efficiency extruder, 20% less power than normal type but 20kg/h higher output. Our 45/28 high speed high efficiency extruder could meet 30~40kg/h, it is enough to support 15m/min for 10-50mm diameter corrugated pipe. if you need to produce larger pipe, we also have AFE75 high speed extruder, which can produce 50~150mm corrugated pipe.
2. Good design and good quality forming machine. Gear driven and 100% covered water cooling system for forming machine to support high speed running.
3. Automatic winder, it could meets 15m/min speed coiling.
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine

Product Parameters

Name
Single wall HDPE PP PE Corrugated pipe extruder machine
Machine size
8~10m in length
Main motor power
37kw main motor power
Voltage
380V 50HZ 3phase
Capacity
50~80kg/h
Warranty period
1 year
Extruder
SJ 45/33
SJ 65/30
SJ 65/33
SJ75/33
Main motor power
11-18.5kw
18.5kw
32kw
37kw
Molding
44-72pairs
60-72pairs
60pairs
60~90pairs
Pipe diameter
10-50mm
30-75mm
40-100mm
50~150mm
Output
30~40kg/h
50~60kg/h
60~90kg/h
80~120kg/h

Detailed Photos

 
 
 
 
 
 
 
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
 
 
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine

Packaging & Shipping

PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine

Company Profile

Suzhou Aifuer Machinery Co., Ltd.

Suzhou Aifuer Machinery Co., Ltd. is the professional manufacturer for kinds of plastic machines, such as 3D printer filament extruder, plastic pipe extrusion line, plastic profile extrusion line, waste plastic recycling machine, plastic crusher & Shredder and plastic process auxiliary machines, etc.

The target of Suzhou Aifuer Machinery Co.,Ltd is to offer the best quality machines to the customers from all over the world. With the advanced technology, experienced engineers and skilled workers, we have the capability to manufacture specific machines according to customer's requirement.

Excellent quality and professional service is the promise made by Suzhou Aifuer Machinery Co.,Ltd to new and old friends. We are looking forward to establishing the good cooperation relationship with you on the basis of mutual benefits.
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine


Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English) for the extrusion machine.
2. Seller supply training for buyer's staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer's factory.
4. Buyer should pay the expense for our engineers including for our engineer including round- way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing and testing these machines. Buyer should pay 100 USD/day.
6. When installing, people of both sides cooperate well and carefully, buyer supplies convenient working condition, any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-run the machine for testing and other expenses(electric,water, air and worker) will be on seller's account, if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 12 months after shipment (the date of B/L)
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine
PVC HDPE Plastic Double Wall Corrugated Dwc Corrugated Pipe Extruder Machine

FAQ

1. How can we go to your factory? 
Our factory is located in Suzhou zhangjiagang, Jiangsu Province, China, You can fly to Shanghai Pudong International Airport then come to Suzhou by High-speed railway, then we will pick you up in the railway station. All our clients, from domestic or abroad, are warmly welcome to visit us!
 
2. Why chose us?
1)Quick reply. Once we received the inquiry from platform, we will reply you within 12 hours.
2)Quick manufacturing time. To guarantee the quality, the machine will be finished within 30 days
3) Before delivery, the machine will be tested to ensure every part is ok through 6 times.
4) Wooden case package to ensure no damage during shipping.
 
3.What is the payment?
T/T payment ,Cash,Paypal, 
30% contract value as deposit after signing contract; 
70% contract value as payment balance after customer's testing machine before delivery.
 
4.What about the delivery time?
As usually, the delivery time is 30-45 working days; If your order is urgent, the delivery time is within 7 days, we need to
negotiate according to your machine.

 
 
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier